CR3 Guangzhou Metro No.9, No.13, so as the Dongguan to Huizhou Intercity Track achieved operation synchronous
In Jan.5th, the participation of Guangdong Company of CR3 on Metro Line No.9, No.13, so as the Dongwan to Huizhou Intercity Track went into operation at the same time.
The operation of Guangzhou Metro Line No.9, No.13 brought more closed connections within the Guangzhou city, opened a brand new pattern of the development of Guangzhou East area, as well as contributed to the formation of Guangzhou international aviation hub.
After the operation of Dongguan to Huizhou Intercity Track, the centre of Dongguan will be linked with the centre of Huizhou, it will only take 90 minutes. This intercity line created a touching picture of the connection between Dongguan & Huizhou, moreover, it will also enhance the economic effects to the surrounding areas.